Got the bashsea sump on line, this can handle a couple thousand gallons an hour going through it into the rubbermaid sump below so should work out great. Likely have about 1000 gph going through the display after head loss.
Finished up all the plumbing lines on the basement side. All three drains and the return line plumbed up through the floor under the stand now just need to connect to the tank once in place
Finished up all the plumbing lines on the basement side. All three drains and the return line plumbed up through the floor under the stand now just need to connect to the tank once in place