what’s good
I want to know if anyone has tried to tumble / turn chaeto in the section of the factory red sea sump that the drain plumbing pours into. the thought is to put a 90° elbow pvc connector at the end of the drain pipe and use the drain flow to tumble the chaeto. I’m curious if that’d be enough flow.
i really don’t want to add another pump or plumbing so hoping this would be a clean and simple solution.
tia!
I want to know if anyone has tried to tumble / turn chaeto in the section of the factory red sea sump that the drain plumbing pours into. the thought is to put a 90° elbow pvc connector at the end of the drain pipe and use the drain flow to tumble the chaeto. I’m curious if that’d be enough flow.
i really don’t want to add another pump or plumbing so hoping this would be a clean and simple solution.
tia!
Last edited: