Hey guys,
I recently picked up a new (to me) tank, stand and a sump that is hard plumbed really nicely with schedule 80 unions. The problem is, where I would plumb in the return pump, it has a 1 inch (roughly) male threaded fitting. I need to know how to transition the threaded male fitting down to a 3/4" barbed fitting so that I can run a foot or so of silicone tubing to the return pump. I'm not very good when it comes to transitioning plumbing. (Can send pictures later if you need clarification).
Let me know your thoughts.
Thanks everyone!
I recently picked up a new (to me) tank, stand and a sump that is hard plumbed really nicely with schedule 80 unions. The problem is, where I would plumb in the return pump, it has a 1 inch (roughly) male threaded fitting. I need to know how to transition the threaded male fitting down to a 3/4" barbed fitting so that I can run a foot or so of silicone tubing to the return pump. I'm not very good when it comes to transitioning plumbing. (Can send pictures later if you need clarification).
Let me know your thoughts.
Thanks everyone!