Another small update over here. Picked up the ADJ 15 amp rocker switch and installed into the cabinet. Toggle 1 is my return pump for now until the controller gets hooked up. Toggle 2 is for my first Tunze 6095 running a wave program, toggle 3 is for my second Tunze 6095 running a full stream. The 2 heaters will remain on their own dedicated circuit. I plan on adding another 2 to 3 Tunze's in the future for the 100 gallon, these will also be plugged in here. Tomorrow at some point will be wire management and the routing of the RoDi line from the top off container to the barrels in the other room. Stay tuned