Hey everybody. So I thought my 90g was leaking(bulkhead was cracked instead) and had the opportunity to upgrade to a 125g. My landlord gave me permission to put pipes through the floor for a basement sump also so I decided to do a build thread.
First off I built the stand. I made it out of 4x4s and 2x4s and skinned it with luan plywood.
First off I built the stand. I made it out of 4x4s and 2x4s and skinned it with luan plywood.