Has anyone done this? Any feedback? I am considering T ing off of Locline and bringing some pvc drilled with holes to act as a spray bar for the deep bottom behind and under rockscape. I am trying to use the return pump for 1 task, rather than additional closed loop holes and extrra pump. I am thinking with that the other Locline T with 1 inch hole will be at the surface to handle the siphon break when power is off correct?
Also does anyone have pics of a setup or performance based on size of holes drilled etc? Is it really necessary to even do this?
Thanks
Also does anyone have pics of a setup or performance based on size of holes drilled etc? Is it really necessary to even do this?
Thanks