I will be upgrading to a 210 in the next couple of weeks. I will be using a 55g as sump/fuge. I just bought all the plumbing from durso standpipes and everything (bulkheads and pipes) is already installed.
I need help with the plumbing on how to plan/connect it. I will be using an eheim 1262 as a return.
This is my current plan. Does it seem ok? At the drains, should I add a 90* or a 45* elbows to help with the splashing noise coming from the overflow?
I need help with the plumbing on how to plan/connect it. I will be using an eheim 1262 as a return.
This is my current plan. Does it seem ok? At the drains, should I add a 90* or a 45* elbows to help with the splashing noise coming from the overflow?